Project:
Chongqing West Hospital is built according to the standard of Grade III and Grade A general hospitals, and four-tube multifunctional heat pump units are used in the clean operating department, with a total cooling load of 1144kW and a total heating load of 1446kW.
System Type:
Installed Units:
2 × ERACS2422E-Q-B
Solution:
The purification air-conditioning system of the clean operation department of this project is designed as a four-pipe air-conditioning water system, and the host adopts two four-pipe air-cooled screw heat pump units as independent cold and heat sources.
Certification: