Beijing Jiangong Building

Area:Beijing System Type: Construction Area: Application Type:Office Buildings Cooling Capacity:4400kW Heating Capacity:

Project:

Beijing Construction Building project adopts water-cooled magnetic levitation frequency conversion centrifugal chiller as its cooling source equipment, with a total cooling load of 4400kW

Installed Units:

2X TECS-W2152L-E 2X TECS-W3252L-E

Solution:

The lithium bromide unit was used as the cold source equipment in the early stage of Beijing Construction Engineering Building project. Due to power distribution problems, the project adopts water-cooled magnetic levitation frequency conversion centrifugal chiller after transformation to solve the power distribution problems. Because the unit has higher partial load energy efficiency, it can save more operation cost for the project

Certification:

Projects

APPLICATION
Projects

Beijing Jiangong Building

Area:Beijing System Type: Construction Area: Application Type:Office Buildings Cooling Capacity:4400kW Heating Capacity:

Project:

Beijing Construction Building project adopts water-cooled magnetic levitation frequency conversion centrifugal chiller as its cooling source equipment, with a total cooling load of 4400kW

System Type:

Installed Units:

2X TECS-W2152L-E 2X TECS-W3252L-E

Solution:

The lithium bromide unit was used as the cold source equipment in the early stage of Beijing Construction Engineering Building project. Due to power distribution problems, the project adopts water-cooled magnetic levitation frequency conversion centrifugal chiller after transformation to solve the power distribution problems. Because the unit has higher partial load energy efficiency, it can save more operation cost for the project